Guides · Guide 8
Sample schedules
Two ways to fit a loaf around a normal week, using the fridge to move the long waits to where they suit you.
Sourdough takes a long time but very little attention. The fridge is the tool that makes it fit a working week: cold slows fermentation almost to a stop, so you can pause the dough overnight, or for a whole day.
Both schedules use the basic loaf and assume a kitchen at about 24 °C (75 °F). In a cooler room, every step takes longer.
Weekend loaf
Bread for Sunday breakfast.
| When | Step |
|---|---|
| Saturday 08:00 | Build the levain |
| Saturday 14:00 | Autolyse |
| Saturday 14:45 | Mix in levain and salt |
| Saturday 15:15–16:45 | Four sets of folds, 30 minutes apart |
| Saturday 20:00 | Bulk finished; pre-shape |
| Saturday 20:30 | Shape; into the fridge |
| Sunday 07:45 | Heat the oven and pot |
| Sunday 08:30 | Bake |
| Sunday 09:15 | Out of the oven; cool until about 10:30 |
Weekday loaf
Mixed after work, baked the following evening.
| When | Step |
|---|---|
| Day 1, 07:30 | Build the levain at 1:5:5 (10 g starter, 55 g flour, 55 g water), so that it peaks in the evening |
| Day 1, 18:00 | Autolyse |
| Day 1, 18:30 | Mix in levain and salt |
| Day 1, 19:00–20:30 | Four sets of folds |
| Day 1, 23:30 | Bulk finished; shape; into the fridge |
| Day 2, 18:00 | Heat the oven and pot |
| Day 2, 18:45 | Bake |
This gives a cold proof of about 19 hours, which makes a more sour loaf. Much beyond 24 hours, the dough starts to overproof.
Adjusting a schedule
- To slow things down: use less levain (10% instead of 20%), cooler water, or a cooler spot.
- To speed things up: use more levain (up to 30%), warmer water, or a warm spot such as an oven with only the light on.
- If the timing slips: the fridge buys time at almost any stage. A dough that is nearly through bulk can wait there for a few hours.